Project Specifications
1. One water source well in each village
2. Two – 1000+ gallon water tanks in each project
3. Water stand (Iron structure) for water tanks
4. Generator as primary power source
5. Solar panel as secondary power source
6. A small generator house
7. Water dispensing structure with at least three faucets
8. One submersible pump
9. Project area to be built on a cement slab and secured with
solid brick perimeter walls.
10. Proper lighting for the project area
11. Project site to be provided by the community